PSP Planning and Scheduling Professional Practice Test
AACE scheduling certification covering project planning, schedule development, resource management, schedule analysis, and delay analysis for construction projects. Administered by AACE International. Key domains include Media Planning and Strategy, Brand Awareness Measurement, Budget Allocation and Mix Modeling and Audience Insights and Research. The exam consists of 60 questions over 105 minutes.
Preguntas de Muestra
Prueba algunas preguntas para ver cómo es el examen completo.
During a baseline review for a refinery expansion, the project controls lead asks the scheduler to resolve this issue: Using the same data (BAC=1M, PV=400K, EV=350K, AC=420K), what is SPI?
A progress curve for electrical installation shows 60 percent earned value, while installed quantities show only 45 percent of cable pulled and no terminations complete. What should the scheduler question?
The owner requests that activity durations not exceed 20 working days at the contract schedule level. Which AACE RP supports activity sizing guidance?
On a hospital construction update call, the owner and contractor disagree about the schedule record. The PSP is asked: Per RP 29R-03, the FSA methods are grouped as:
On a transit project with design, procurement, and field work running in parallel, the scheduler must decide: Same numbers (BAC=1M, EV=350K, AC=420K). Using EAC = AC + (BAC - EV), the result is:
Plan de Estudio
Cada dominio está ponderado para coincidir con el examen de certificación real, por lo que una simulación de práctica completa predice tu resultado.