A project has accumulated many minor punch items during installation. The superintendent wants to wait until final walk-through to log them. What should the RTPM require?
A contractor is asked to propose on an OSP segment before utility locates are complete. The owner wants the proposal to state "all trenching included." What is the strongest RTPM response?
A pre-bid walk-through reveals the telecom rooms are being used for storage, ceiling access is blocked by medical gas lines, and the owner's drawings show a straight cable tray route. Which proposal control best addresses this discovery?
A project used several approved RFIs to reroute pathways. At closeout, the archive has the RFIs but the as-built drawings still show original routes. What is wrong?
A client wants to remove contingency from an estimate because a GMP will be negotiated later. The current scope has unresolved ceiling conditions and unknown utility conflicts. What should the RTPM explain?