A permit set for a mixed-use building includes a code summary listing separated occupancies, but the wall sections omit the required occupancy-separation rating at a podium interface. Which QC action is best?
Require the rating strategy to be coordinated into wall sections, details, schedules, and specifications before submission.
Submit as is because the code summary is enough to document separated occupancies.
Remove separated occupancies from the code summary so wall sections no longer conflict.
Let the firestopping subcontractor choose the podium rating during submittals.