An unhandled error has occurred. Reload X
1 / 5
Intermediate
The FAA AD 2024-XX-XX requires repetitive inspection of B737NG fuel tank inerting system wiring at 750 flight-cycle intervals. If the next inspection due is at FC 12,500 and the aircraft is currently at FC 12,300, when is the next inspection?