An unhandled error has occurred.
Reload
X
UIZFORGE
Exams
Pricing
Career Paths
Resources
EN
Login
Sign Up
1
/ 5
Intermediate
A contractor proposes an alternate condensate disposal method for high-efficiency boilers because the jurisdiction has no local amendment on neutralizers. What should the inspector require?
Approve it at inspection if the drain line has continuous fall.
Reject every alternate method because condensate provisions are prescriptive only.
Approve it if the plumbing inspector says the sanitary connection is acceptable.
Route the request through the building official's alternate materials and methods approval process with supporting technical data.
AI Tutor
Stuck? Get a hint