ARE 5.0 Construction and Evaluation Division Practice Test

140 preguntas disponibles

Gana confianza para ARE 5.0 Construction and Evaluation Division. Practica los conceptos, comprende las respuestas y refuerza tus conocimientos pregunta a pregunta.

Probar una pregunta
Prueba 5 preguntas gratis
No necesitas cuenta. Una cuenta gratuita incluye 20 preguntas de este examen.
Examen de certificación
95 Preguntas del examen
3 horas 30 minutos Límite de Tiempo
Tu práctica
140 Preguntas de práctica
2 horas 20 minutos Tiempo de Práctica
Prueba 5 preguntas gratis
No necesitas cuenta. Una cuenta gratuita incluye 20 preguntas de este examen.
El banco 140 Preguntas de práctica verificadas con los objetivos oficiales.
Objetivos oficiales de National Council of Architectural Registration Boards
NCARB140 preguntas de práctica
Temario verificadoVerificado con NCARB official objectivesMetadatos verificados 2026-09-26Cómo verificamos

Descripción y detalles del examen

The ARE 5.0 Construction and Evaluation (CE) Division is a rigorous examination administered by the National Council of Architectural Registration Boards (NCARB) that assesses an architect's competency in the construction and post-occupancy phases of practice. This exam division validates a candidate's ability to translate design intent into built work, manage construction administration processes, and evaluate project performance against established criteria. Passing the CE Division demonstrates mastery of critical skills including construction documentation review, contractor coordination, submittal and RFI processing, payment application evaluation, and the systematic observation of construction for conformance with contract documents. Furthermore, it tests knowledge of post-occupancy evaluation, commissioning, and warranty administration. Achieving a passing score on this exam is a non-negotiable milestone on the path to licensure, signifying to clients, employers, and the public that an architect possesses the technical and procedural expertise required to safeguard health, safety, and welfare through effective construction oversight and project closeout.

Preguntas de Muestra

Elige una respuesta y consulta la explicación para ver cómo funciona la práctica.

Project Closeout and Evaluation

A post-occupancy review of a library finds that west reading rooms overheat every afternoon despite meeting code-minimum energy requirements. The owner asks what the architect should evaluate. Which response is best?

Project Closeout and Evaluation

A contractor asks the architect to certify substantial completion for a laboratory floor. Casework is installed, but emergency eyewash testing is incomplete and the fire marshal has not approved occupancy. What should the architect do?

Administrative Procedures and Protocols

The contractor asks the architect to approve a material price escalation claim for copper purchased six months after the approved procurement schedule showed it should have been bought. The contractor provides invoices but no schedule justification. What should the architect evaluate?

Administrative Procedures and Protocols

The contractor requests approval of a partial occupancy plan for three floors while construction continues above. The plan lacks temporary egress signage, fire alarm phasing, and separation of occupied areas from construction. What should the architect require?

Administrative Procedures and Protocols

The contractor asks whether it may submit one combined closeout package after substantial completion rather than the phased closeout submittals required for early-occupied areas. The owner will occupy two floors while upper floors continue construction. What should the architect consider?

Oportunidades profesionales y salario

Salario medio: $99,280mercado de EE. UU.– Architects, Except Landscape and Naval

Fuente: BLS Occupational Employment and Wage Statistics, May 2025 -- Architects, Except Landscape and Naval (SOC 17-1011), US national. Occupation median, not a certification salary. (2025)

Architects, Except Landscape and Naval

Los rangos son cifras del mercado de EE. UU. salvo que se muestre un rango local.

Qué temas cubre este examen

Usa las ponderaciones publicadas de los dominios para planificar tu estudio. Los resultados de práctica no predicen tu puntuación en el examen de certificación.

01Administrative Procedures and Protocols

32-38%

02Construction Observation

32-38%

03Preconstruction Activities

17-23%

04Project Closeout and Evaluation

7-13%

Detalles del Examen ARE CE | $235 USD | 3 horas 30 minutos

Código del Examen ARE CE
Proveedor NCARB
Costo del Examen $235 USD
Límite de Tiempo 3 horas 30 minutos
Preguntas del examen 95
Tipos de PreguntasAún no disponible en este idioma
Política de Repetición 60-day waiting period between retakes of the same division. Unlimited retakes permitted. All 6 divisions must be passed within a 5-year rolling window. Full exam fee required for each retake.
Formato del Examen Linear computer-based with case study sections (Prometric CBT)
Disponible En
English

Preguntas Frecuentes

¿Cuál es el enfoque principal de la División de Construcción y Evaluación en comparación con otras divisiones de ARE 5.0?

¿Cuánta experiencia profesional en administración de construcción se recomienda antes de intentar este examen?

¿Cuáles son los documentos contractuales clave con los que debo estar familiarizado para este examen?

¿Qué tipos de preguntas puedo esperar en el examen CE?

¿Cómo debo estudiar para la parte del estudio de caso del examen?