PSP Planning and Scheduling Professional Practice Test

160 questions available

Build your confidence for PSP Planning and Scheduling Professional. Practice the concepts, understand the answers, and strengthen your knowledge one question at a time.

Try a sample question
Try 5 free questions
No account needed. A free account includes 20 questions for this exam.
Certification exam
5 hours Time Limit
Professional Level
Your practice
160 Practice questions
2 hours 40 minutes Practice Time
Try 5 free questions
No account needed. A free account includes 20 questions for this exam.
The bar to clear overall average of 70% across the three domain scores Published passing score for this certification.
AACE International160 practice questions

Exam overview and details

AACE scheduling certification covering project planning, schedule development, resource management, schedule analysis, and delay analysis for construction projects. Administered by AACE International. Key domains include Conduct Scheduling Duties, Conduct Planning Duties and Communication.

Sample Questions

Choose an answer and explore the explanation to see how practice works.

Earned Value Management

During a baseline review for a refinery expansion, the project controls lead asks the scheduler to resolve this issue: Using the same data (BAC=1M, PV=400K, EV=350K, AC=420K), what is SPI?

Resource & Cost Loading

A progress curve for electrical installation shows 60 percent earned value, while installed quantities show only 45 percent of cable pulled and no terminations complete. What should the scheduler question?

Planning Development & WBS

The owner requests that activity durations not exceed 20 working days at the contract schedule level. Which AACE RP supports activity sizing guidance?

Earned Value Management

On a transit project with design, procurement, and field work running in parallel, the scheduler must decide: Same numbers (BAC=1M, EV=350K, AC=420K). Using EAC = AC + (BAC - EV), the result is:

Planning Development & WBS

An EPC contractor is preparing its baseline schedule basis for a compressor station. The owner asks why the schedule shows procurement of vendor drawings before purchase order award. Which basis entry best prevents later misunderstanding?

Exam insights and study advice

In the real world, a robust and dynamic project schedule is the single most critical tool for predicting outcomes, managing risk, and enabling informed decision-making. The PSP certification matters because it equips professionals to move beyond simply operating scheduling software to understanding the underlying principles that make a schedule credible, defensible, and actionable. This expertise directly translates to preventing cost overruns, mitigating delays, providing clear communication to stakeholders, and delivering projects on time-directly impacting an organization's profitability and reputation.

What this exam covers

Use the published domain weights to plan your study. Practice results do not predict your certification exam score.

01Conduct Scheduling Duties

70%

Topics

  • Develop schedules (e.g., baseline, recovery, revised, shutdown)
  • Create baseline basis of schedule documents
  • Manually calculate schedule networks
  • Analyze critical and near critical paths
  • Evaluate resource utilization
  • Conduct schedule quality checks
  • Evaluate schedule for contract compliance
  • Evaluate potential schedule risks (e.g., environmental, political, supply chain)
  • Perform schedule cost analyses
  • Audit project baseline schedules
  • Develop reports (e.g., ad-hoc, earned value, look-ahead, variance)
  • Update WBS
  • Train personnel (e.g., methodologies, scheduling techniques)
  • Update progress schedules
  • Monitor resource utilization
  • Facilitate schedule update review meetings
  • Track KPIs
  • Prepare stakeholder progress reports
  • Review stakeholder progress reports (e.g., accuracy, relevance)
  • Communicate with stakeholders (e.g., verbal, written)
  • Analyze schedule performance
  • Report schedule performance (e.g., consultants, owners, subcontractors)
  • Manage baseline schedules (e.g., maintain, revise)
  • Review project schedules
  • Report KPIs
  • Develop schedule scenarios (e.g., alternate, what-if)
  • Review updated SOWs
  • Perform schedule impact analyses (e.g., additions, change in scope, delay)
  • Perform basic delay analyses
  • Perform schedule change management
  • Prepare time extension documentation
  • Review schedule impact analyses (e.g., additions, change in scope, delay)
  • Review delay analyses
  • Conduct schedule close-outs

Learning objectives

  • Develop schedules (e.g., baseline, recovery, revised, shutdown)
  • Create baseline basis of schedule documents
  • Manually calculate schedule networks
  • Analyze critical and near critical paths
  • Evaluate resource utilization
  • Conduct schedule quality checks
  • Evaluate schedule for contract compliance
  • Evaluate potential schedule risks (e.g., environmental, political, supply chain)
  • Perform schedule cost analyses
  • Audit project baseline schedules
  • Develop reports (e.g., ad-hoc, earned value, look-ahead, variance)
  • Update WBS
  • Train personnel (e.g., methodologies, scheduling techniques)
  • Update progress schedules
  • Monitor resource utilization
  • Facilitate schedule update review meetings
  • Track KPIs
  • Prepare stakeholder progress reports
  • Review stakeholder progress reports (e.g., accuracy, relevance)
  • Communicate with stakeholders (e.g., verbal, written)
  • Analyze schedule performance
  • Report schedule performance (e.g., consultants, owners, subcontractors)
  • Manage baseline schedules (e.g., maintain, revise)
  • Review project schedules
  • Report KPIs
  • Develop schedule scenarios (e.g., alternate, what-if)
  • Review updated SOWs
  • Perform schedule impact analyses (e.g., additions, change in scope, delay)
  • Perform basic delay analyses
  • Perform schedule change management
  • Prepare time extension documentation
  • Review schedule impact analyses (e.g., additions, change in scope, delay)
  • Review delay analyses
  • Conduct schedule close-outs

02Conduct Planning Duties

30%

Topics

  • Develop specifications (e.g., planning, scheduling)
  • Collaborate in the development of SOWs
  • Review project documents (e.g., contracts, cost estimates, drawings, plans, SOWs)
  • Implement project documents into the plan (e.g., contracts, cost estimates, drawings, plans, SOWs)
  • Develop WBS (e.g., disciplines, phases)
  • Conduct constructibility review
  • Develop phase sequencing and relationships
  • Identify key resources (e.g., equipment, labor, material(s))
  • Define/Identify potential schedule risks (e.g., environmental, political, supply chain)
  • Determine appropriate level of schedule detail
  • Define KPIs
  • Support CBS development
  • Support OBS development
  • Support EBS development
  • Support the value engineering process
  • Support stakeholder session(s) (e.g., constructibility, development, Partnering)

Learning objectives

  • Develop specifications (e.g., planning, scheduling)
  • Collaborate in the development of SOWs
  • Review project documents (e.g., contracts, cost estimates, drawings, plans, SOWs)
  • Implement project documents into the plan (e.g., contracts, cost estimates, drawings, plans, SOWs)
  • Develop WBS (e.g., disciplines, phases)
  • Conduct constructibility review
  • Develop phase sequencing and relationships
  • Identify key resources (e.g., equipment, labor, material(s))
  • Define/Identify potential schedule risks (e.g., environmental, political, supply chain)
  • Determine appropriate level of schedule detail
  • Define KPIs
  • Support CBS development
  • Support OBS development
  • Support EBS development
  • Support the value engineering process
  • Support stakeholder session(s) (e.g., constructibility, development, Partnering)

03Communication

One memo-writing assignment: a given scenario and instructions for writing a response in an onscreen text box.

Exam Details 5 hours

Vendor AACE International
Passing Score overall average of 70% across the three domain scores
Time Limit 5 hours

Frequently Asked Questions

How much hands-on scheduling experience is needed before attempting the PSP?

Is the exam solely focused on Critical Path Method (CPM) scheduling?

What is the exam format, and how is it scored?

Are specific software skills tested (e.g., Primavera P6, Microsoft Project)?

What are the most effective study resources?