ICC Commercial Building Inspector (B2) Practice Test

190 questions available

Build your confidence for ICC Commercial Building Inspector (B2). Practice the concepts, understand the answers, and strengthen your knowledge one question at a time.

Try a sample question
Try 5 free questions
No account needed. A free account includes 20 questions for this exam.
Certification exam
80 Exam questions
3 hours 30 minutes Time Limit
Your practice
190 Practice questions
3 hours 10 minutes Practice Time
Try 5 free questions
No account needed. A free account includes 20 questions for this exam.
The bank 190 Practice questions checked against the official objectives.
Official objectives from ICC
ICC (International Code Council)190 practice questionsBank updated 2026-06-09

Exam overview and details

These independent practice questions target the ICC Commercial Building Inspector exam, exam ID B2. This practice material is not produced by ICC. Administered by ICC as a computer-based at pearson vue or icc testing sites format exam. Key domains include Public Safety and Special Construction, Wall Construction and Coverings, Building Planning and Floor Construction.

Sample Questions

Choose an answer and explore the explanation to see how practice works.

Footings and Foundations

At the concrete placement inspection for a slab-on-grade in a new commercial building, the delivery ticket shows 3,000 psi concrete with a specified 4-inch slump. The contractor adds approximately 1 gallon of water per cubic yard at the jobsite to improve workability after the inspector measures a 3-inch slump on the first load. No high-range water reducer was included in the original mix. Which action must the inspector take?

Accessibility Requirements (ADA)

A contractor is installing a new accessible route in the lobby of an existing Group B office building undergoing a Level 2 alteration. The running slope of the new 40-foot ramp is measured at 1:14. The ramp has 34-inch high handrails on both sides extending 12 inches beyond the top and bottom landings. The cross slope is 1:50. The clear width between handrails is 36 inches. Does the ramp comply with ICC A117.1?

Life Safety and Fire Protection

A new 4-story mixed-use building contains Group R-2 apartments above a Group M retail base. The inspector is verifying the 2-hour fire wall separating the R-2 from the M occupancy. The wall is constructed of 8-inch CMU with a 2-hour rating, extends continuously from the foundation through the roof deck, and all penetrations are properly firestopped. However, the plans examiner had required the wall to be a fire wall with a 3-hour rating because the building is 4 stories. The field inspector observes the 2-hour CMU wall in place. What is the correct determination?

Commercial Construction Inspection

The inspector arrives for a scheduled framing inspection on a new 12,500-square-foot Group M building. The contractor has not yet installed the required hold-downs at the shear walls shown on the approved structural plans and states that the hardware will be installed "before drywall." The 2021 IBC and the local jurisdiction's amendments require all structural elements to be installed and inspected prior to covering. Which action is required?

Structural Requirements

During a framing inspection, the inspector observes that the roof trusses for a new 18,000 sq ft Group M building bear on 2x6 exterior walls with a 2x6 top plate. The truss design drawings specify a minimum 3-1/2 inch bearing on the top plate with hurricane ties at each truss. The installed bearing is 2-1/2 inches at several locations and the hurricane ties are installed on only every other truss. What corrections are required?

Career Opportunities & Salary

Median salary: $74,690– Construction and Building Inspectors

Source: BLS Occupational Employment and Wage Statistics, May 2025 -- Construction and Building Inspectors (SOC 47-4011), US national. Occupation median, not a certification salary. (2025)

Construction and Building Inspectors

Exam insights and study advice

This practice focuses on the ICC Commercial Building Inspector exam, identified by exam ID B2.

What this exam covers

Use the published domain weights to plan your study. Practice results do not predict your certification exam score.

01Public Safety and Special Construction

31%

02Wall Construction and Coverings

21%

03Building Planning

20%

04Floor Construction

8%

05Footings and Foundations

8%

06General Administration

6%

07Roof/Ceiling Construction

6%

Exam Details B2 | 3 hours 30 minutes

Exam Code B2
Vendor ICC (International Code Council)
Time Limit 3 hours 30 minutes
Exam questions 80
Exam Format Computer-based at Pearson VUE or ICC testing sites
Exam rules Computer-based exams administered at Pearson VUE testing centers or ICC-authorized sites. No personal reference materials permitted during the exam. Certain ICC exams are open-book (code book allowed) — verify for specific exam. Candidates must present valid photo ID at the testing center.

Frequently Asked Questions

Which exam does this practice target?

What is the exam ID for ICC Commercial Building Inspector?

Is this practice material produced by ICC?